TENDER NOTICE
SL. Title Publish Date Last Date of
Submission
View/Download
1 Road restoration work at CEC and minister residence, mintu road area under DMA-614 area under ICB 02.7 of DESWSP, DWASA. (W 1/Lot no.-10) 12 Jul 2020 20/07/2020
2 "Road Restoration Work At Cheif Jusatice Bhaban, Kakrail Under DMA-614 Area Under ICB 02.7 of DESWSP, DWASA."ROAD RESTORATION WORK AT CHEIF JUSATICE BHABAN, KAKRAIL UNDER DMA-614 AREA UNDER ICB 02.7 OF DESWSP, DWASA. (W 1/LOT NO.-09)" 12 Jul 2020 20/07/2020
3 Khoa ConsolidationTemporary Khoa Reinstatement work at different location of DMA-614 of MODS Zone-6 area under DESWSP, DWASA. 15 Mar 2020 24/03/2020
4 Procuremet of Service MSC deswsp DWASA 23 Nov 2019 21.11.19
5 Procurement of Service NGO Resetlement 23 Nov 2019 21.11.19
6 Replacement and construction of DTW Lot 4 23 Nov 2019 21.11.19
7 Replacement and construction of DTW Lot 3 23 Nov 2019 21.11.19
8 Replacement and construction of DTW Lot 2 23 Nov 2019 21.11.19
9 Replacement and construction of DTW Lot 1 23 Nov 2019 21.11.19
10 Addenda 1 to 2 package 3.1 12 May 2019 12.5.2019
11 clarification 1-2 package 3.1 12 May 2019 12.5.2019
12 Addenda 1to 4 package 2 12 May 2019 12.5.2019
13 clarification 3 addenda 4 package 2 12 May 2019 12.5.2019
14 Invitation of Expression of Interest (For Individual Consultants) 31 Mar 2019 23/04/2019
15 DESWSP Package 2 - EXTENSION of bid submission date to 28 April 2019 31 Mar 2019
16 IFB for Primary Distribution Pipelines under DESWSP,DWASA(Package-03.1,Contract No-ICB-4/TWP/DESWSP/2018) 03 Mar 2019 30th April 2019
17 IFB for Treated Water Pipeline Package 2, DESWSP DWASA 05 Feb 2019 5.2.2019
18 Addenda ICB 05.5B 20 Aug 2017 28.8.2017
19 Specification of PR Valve ICB 04.10B 20 Aug 2017 28.8.17
20 Addenda and Clarification ICB 04.10B 20 Aug 2017 28.8.2017
21 Corrigendum Notice ICB 05.5 B 18 Jul 2017 21.8.2017
22 Corrigendum Notice ICB 04.10B 18 Jul 2017 21.8.2017
23 Tender Notice for ICB 05.5B( DATA Logger ) , DESWSP DWASA 06 Jul 2017 6.7.2017
24 Tender Notice for ICB 04.10B( Regular Valve ) , DESWSP DWASA 06 Jul 2017 6.7.2017
25 Addendum-1 subsoil investigation deswsp dwasa 01 Apr 2017 30.3.17
26 Tender Notice for Sub Soil Investigation DESWSP DWASA 15 Mar 2017 30.4.2017
27 EIA Report, DESWSP, DWASA. 08 Oct 2015 08/10/2015
28 EIA Report, DESWSP, DWASA. 08 Oct 2015 08/10/2015
29 EIA Report, DESWSP, DWASA. 08 Oct 2015 08/10/2015
30 Final DBO Contract _ All Addenda and Clarification _ 04.02.2015 04 Feb 2015
31 Corrigendum 5, Corrigendum Notice (Submission date extended) Package 1 (D&B Contract) is : ICB-01lB&DIDESWSP/2014 & Package 2 (O&M Contract) is: ICB-02/0&MlDESWSP/2014 22 Dec 2014 03 rd March, 2015 of 14.0
32 Corrigendum Notice-procurement of special Valves (Pressure Sustaining Valves, Pressure Reducing Valves and Air Release Valves) Contract No. ICB 04.9 21 Oct 2014 03rd November 2014 up to
33 Dhaka ESWSP - Pre bid Agenda _21-22 _ Oct 2014_16.10.14 19 Oct 2014
34 Clarifications and Addenda -1_ DBo contract DESWSP DWASA Final 14.10.2 16 Oct 2014
 
 
HOME | ABOUT DESWSP | DESWSP OBJECTIVES | DOWNLOAD | PROJECT DETAILS | USEFUL LINKS | CONTACT US | SITE MAP © COPYRIGHT 2013 DESWSP-DWASA. ALL RIGHTS RESERVED